The data center boom is fully underway, and the numbers are staggering: billions of dollars in costs, millions of square feet worth of buildings, gigawatts of energy, and millions of gallons of water used per day. But before these AI-fueling behemoths can get up and running, there's an extensive amount of prep work needed to build the infrastructure those data centers rely upon, with a whole other set of staggering costs, material flows, and resource requirements.
The white coating, a porous paint-like material, reflects up to 97% of sunlight and radiates heat, making surfaces up to 10 degrees cooler than the surrounding air, even under direct sun. This cooler condition allows water vapor in the air to condense like dew on the smooth coating surface, where it can be collected. In a recent test, a roughly 10-square-foot area treated with the coating was able to harvest 1.6 cups of water over the course of single day.